Zenith

Drain Back Solar Water Heating System

Zenith drain back solar water heating uses a collector loop that drains when circulation stops, with documented high-temperature collector construction.

Drain Back Solar System

Drain back solar system with certified collector technology and high-temperature resistant materials.

ApprovalCertifiedPrice on request
Talk to sales
SystemDrain back
CertificationEN 12975-2
MarkSolar Keymark
CollectorHigh-temp
CaseAluminum profile
ProtectionCE
  • Manufactured by Star Industrial Products LLC
  • Installation & after-sales support
  • Certified quality range

An inactive collector loop that drains back

When solar heating stops, fluid returns from the collector loop to storage. The system is intended to protect the inactive loop from stagnation and freezing conditions.

  • Collector loop drains when circulation stops
  • High-temperature resistant collector design
  • Aluminium profile case

Check the product-specific records

The published system information references EN 12975-2-2006, CE, and Solar Keymark. Certification scope is product-specific, so confirm the relevant documents before writing a project specification.

Talk to Zenith about your water heating requirement

For product selection, installation guidance, project requirements, OEM partnerships, or quote requests, the Zenith team can be contacted through local and international sales channels.

Tell Zenith what you are heating. They will help size the solution.

Reach local or international sales for product selection, installation guidance, project requirements, OEM discussions, and quotes.

Contact Zenith

Frequently asked questions

What happens when a drain back system stops circulating?

Fluid returns from the collector loop to storage when solar heating stops, leaving the inactive collector loop drained.

Which certification references are published for the drain back system?

The published system information references EN 12975-2-2006, CE, and Solar Keymark. Confirm product-specific scope before specifying a mark.

What installation details should be reviewed?

Review collector placement, loop design, storage position, roof and service access, controls, water quality, and the project's hot-water demand.

READY TO WORK WITH ZENITH

Stock Zenith, or specify it into your next project.

Talk to the team that builds, certifies, and supports every unit in the UAE.